A large-scale pipe freeze in Central London to allow our works to continue on the installation of a new large-scale connection from an existing energy generation site.

The DN200 pipes are used to supply Chilled Water to multiple critical buildings throughout the City of London.

This pipe freeze was just one of many hot taps, pipe freezes, and line stops that are ongoing to allow a new LTHW & CHW connection to a very special new building.

The spaces in this building are extremely tight to work within, and show the expertise that we can bring to this type of large-scale energy project.

Citigen - Industrial (Museum of London - LTHW + CHW Connections)

Contract Value: £1,600,000

Client: E.ON Infrastructure Solutions

Mechanical Design & Build Project